{"id":103,"date":"2026-10-04T17:15:53","date_gmt":"2026-10-04T17:15:53","guid":{"rendered":"https:\/\/infranovagroup.ae\/blog\/?p=103"},"modified":"2026-10-08T20:26:35","modified_gmt":"2026-10-08T20:26:35","slug":"property-renovation-process-in-dubai","status":"publish","type":"post","link":"https:\/\/infranovagroup.ae\/blog\/property-renovation-process-in-dubai\/","title":{"rendered":"The Full Property Renovation Process in Dubai"},"content":{"rendered":"<p>A <strong>full property renovation in Dubai<\/strong> is not simply a sequence of construction tasks. It is a coordinated process that moves from a clear owner brief through survey, design, technical planning, approvals, procurement, site execution, quality control, and final handover. The order matters because each stage produces information or approvals needed by the next. For owners planning villa, townhouse, apartment, or penthouse works, understanding those decision gates can reduce late changes and make responsibilities clearer. For delivery support, see <a href=\"https:\/\/infranovagroup.ae\/services\/renovation\">Renovation services in Dubai<\/a>.<\/p>\n<table>\n<thead>\n<tr>\n<th>Stage<\/th>\n<th>Owner Input<\/th>\n<th>Professional Output<\/th>\n<th>Decision Gate<\/th>\n<th>Risk if Delayed<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>1. Renovation brief<\/td>\n<td>Goals, priorities, intended use, constraints<\/td>\n<td>Agreed project brief<\/td>\n<td>Confirm what the project must achieve<\/td>\n<td>Design begins around unclear priorities<\/td>\n<\/tr>\n<tr>\n<td>2. Survey and assessment<\/td>\n<td>Access and available property records<\/td>\n<td>Measurements, condition findings, constraints<\/td>\n<td>Confirm known site conditions<\/td>\n<td>Design assumptions may need rework<\/td>\n<\/tr>\n<tr>\n<td>3. Concept and feasibility<\/td>\n<td>Layout and style preferences<\/td>\n<td>Concept layouts and feasibility feedback<\/td>\n<td>Approve direction before detailing<\/td>\n<td>Major changes move into more expensive stages<\/td>\n<\/tr>\n<tr>\n<td>4. Technical design and scope<\/td>\n<td>Timely selections and decisions<\/td>\n<td>Coordinated drawings, specifications, scope of work<\/td>\n<td>Freeze the package for pricing and execution<\/td>\n<td>Gaps create pricing and site ambiguity<\/td>\n<\/tr>\n<tr>\n<td>5. Approvals, programme, procurement<\/td>\n<td>Required owner documents and approvals<\/td>\n<td>Submission package, programme, procurement plan<\/td>\n<td>Authorize submissions and key orders<\/td>\n<td>Site start or material availability may be affected<\/td>\n<\/tr>\n<tr>\n<td>6. Mobilisation and demolition<\/td>\n<td>Access authorization<\/td>\n<td>Protected site, controlled strip-out, exposed-condition checks<\/td>\n<td>Confirm any newly discovered condition<\/td>\n<td>Hidden issues can disrupt the sequence<\/td>\n<\/tr>\n<tr>\n<td>7. Civil and MEP execution<\/td>\n<td>Approval of necessary technical changes<\/td>\n<td>Coordinated civil and MEP first-fix works<\/td>\n<td>Sign off concealed works before closing<\/td>\n<td>Rework may be required after finishes begin<\/td>\n<\/tr>\n<tr>\n<td>8. Finishes and installation<\/td>\n<td>Final material and fixture confirmations<\/td>\n<td>Completed finishes, joinery, fixtures, lighting, sanitaryware<\/td>\n<td>Approve samples and visible details<\/td>\n<td>Late selections can hold multiple trades<\/td>\n<\/tr>\n<tr>\n<td>9. Quality control and variations<\/td>\n<td>Written decisions on proposed changes<\/td>\n<td>Inspection records, progress updates, variation documentation<\/td>\n<td>Approve any scope, cost, or programme change<\/td>\n<td>Informal changes create disputes and rework<\/td>\n<\/tr>\n<tr>\n<td>10. Snagging and handover<\/td>\n<td>Walkthrough feedback and acceptance<\/td>\n<td>Rectification, testing, records, handover pack<\/td>\n<td>Confirm completion and outstanding items<\/td>\n<td>Defects or documents remain unresolved<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Before the Process Begins: Define the Renovation Outcome<\/h2>\n<p>Before drawings begin, define what success means for the property. The answer may be a more functional family home, a layout better suited to entertaining, an apartment prepared for long-term occupancy, or a commercial space that supports operations and brand requirements. The desired outcome shapes every later decision.<\/p>\n<p>Start with the current problems: poor circulation, insufficient storage, outdated finishes, underperforming lighting, limited power points, worn bathrooms, unsuitable room sizes, or external areas that are not being used effectively. Then define who will use the property, what daily routines matter, what must remain, and what may change.<\/p>\n<p>You should also agree who has authority to make decisions. Renovations slow down when material, layout, or technical approvals pass between several people without a clear final decision-maker. At this point, it is useful to distinguish preferences from constraints. Preferences can include style, finishes, and furniture direction. Constraints can include property condition, access rules, existing services, structural limitations, building or community requirements, and the overall commercial boundaries of the project.<\/p>\n<p>Detailed cost, timeline, approval, contractor-selection, and scope-checklist questions should be treated as separate planning exercises. At this stage, the goal is to establish the outcome and the information the team needs to investigate.<\/p>\n<h2>Stage 1 \u2014 Build a Clear Renovation Brief<\/h2>\n<p>The renovation brief translates the owner\u2019s goals into a working reference. It should communicate the property type, intended use, key problems, areas in scope, design priorities, known technical concerns, finish expectations, and non-negotiable requirements.<\/p>\n<p>A useful brief does not need to prescribe every product or construction detail. It should make priorities explicit enough for the design team to test options against them. It should also identify available information\u2014such as original drawings, previous alteration documents, equipment information, or building-management correspondence\u2014so gaps can be verified during survey and technical design.<\/p>\n<h2>Stage 2 \u2014 Complete the Site Survey and Condition Assessment<\/h2>\n<p>A survey turns the brief into site-specific information. The team records dimensions, levels, access constraints, visible finishes, equipment, and conditions that may affect the renovation. Existing mechanical, electrical, and plumbing systems\u2014commonly shortened to MEP\u2014should be reviewed where relevant to the planned scope.<\/p>\n<p>Condition assessment may identify visible moisture, damaged finishes, uneven surfaces, service conflicts, or other issues requiring investigation. A visual inspection is not a substitute for specialist testing; structural concerns, concealed water ingress, electrical faults, or similar issues may need specialist assessment. Available drawings should also be checked against the actual property rather than assumed to be current.<\/p>\n<h2>Stage 3 \u2014 Develop the Concept and Test Feasibility<\/h2>\n<p>Concept design tests how the renovation could solve the problems identified in the brief. It can cover layout, circulation, storage, furniture planning, lighting intent, material direction, and the visual character of the property.<\/p>\n<p>The concept must also be tested against practical constraints such as drainage, ceiling zones, HVAC distribution, structure, access, and existing services. This is also the right stage to compare priorities with the project\u2019s commercial limits before technical design and procurement begin. If you need an early project estimate rather than a detailed costing exercise, InfraNova\u2019s <a href=\"https:\/\/infranovagroup.ae\/calculator\">renovation cost calculator<\/a> can provide a starting point based on the information entered.<\/p>\n<h2>Stage 4 \u2014 Prepare Technical Design, Specifications, and Scope<\/h2>\n<p>Once the concept is approved, the team develops the information required to price, coordinate, approve, and build the project. Depending on scope, this can include dimensioned layouts, ceiling plans, lighting and power plans, plumbing and HVAC information, wet-area details, joinery drawings, material schedules, and specifications.<\/p>\n<p>The scope of work should define inclusions clearly enough that the client, project team, and trades are working from the same basis. A bill of quantities (BOQ), when used, organizes measurable work items for pricing and commercial control, but it should be read together with drawings and specifications. Exclusions and third-party interfaces should also be identified so responsibility is clear before execution.<\/p>\n<h2>Stage 5 \u2014 Confirm Approvals, Programme, and Procurement<\/h2>\n<p>Approval requirements in Dubai depend on the property, location, community or building, and proposed works. An apartment may involve building-management procedures, while a villa may involve community or authority requirements that differ by development and scope. A No Objection Certificate (NOC) may be required in some situations, but one process should not be assumed for every property.<\/p>\n<p>Dubai Municipality publishes <a href=\"https:\/\/www.dm.gov.ae\/municipality-business\/building-permit-steps\/\" target=\"_blank\" rel=\"nofollow noopener\">Building Permit Procedures<\/a> for works within its remit. The project team should confirm the actual approval path for the specific address and scope before work begins.<\/p>\n<p>The programme should also connect approvals, procurement, and site sequencing. Long-lead materials, custom joinery, imported fixtures, or specialist systems may require decisions well before installation. Owners provide required documents and timely approvals; the project team identifies dependencies, prepares technical information, and coordinates the programme around confirmed requirements.<\/p>\n<h2>Stage 6 \u2014 Mobilisation, Protection, and Demolition<\/h2>\n<p>Mobilisation is the controlled transition from planning to physical work. Before demolition, the site should be prepared around access conditions and the approved scope. This may include permits, protection to retained areas, temporary arrangements, service isolation where required, and waste-removal planning.<\/p>\n<p>Demolition should follow the agreed drawings and scope. Once finishes or partitions are removed, concealed conditions may appear that were not visible during survey. The team should record those findings, assess whether they affect design or scope, and obtain the necessary decision before proceeding.<\/p>\n<h2>Stage 7 \u2014 Civil and MEP Execution<\/h2>\n<p>Civil and MEP work must be closely coordinated because walls, ceilings, wet areas, lighting, power, plumbing, drainage, and HVAC systems occupy shared space. First-fix work refers to concealed or preparatory service installation completed before final fixtures and finishes are installed.<\/p>\n<p>Wet areas require coordination of substrate preparation, falls, waterproofing, penetrations, and later fixture installation. Ceilings must coordinate lighting, diffusers, access panels, and other services. Inspection points should be built into the sequence so concealed work can be checked before walls or ceilings are closed; otherwise, missed services or clashes may require disruptive rework.<\/p>\n<h2>Stage 8 \u2014 Finishes, Joinery, Fixtures, and Final Installation<\/h2>\n<p>The finishes stage converts the technical build into the visible interior. Surface preparation, tiling, flooring, ceilings, painting, joinery, lighting, sanitaryware, hardware, appliances, and final fixtures must be sequenced so completed work is not repeatedly disturbed.<\/p>\n<p>Material decisions should be substantially resolved before this stage. Late changes to tile sizes, sanitaryware, hardware, lighting, or joinery finishes can affect dimensions, procurement, and installation details. Bespoke joinery also needs coordination with actual site dimensions, adjacent finishes, power points, appliances, and hardware. Quality checks should continue during installation rather than being left entirely to final snagging.<\/p>\n<h2>Stage 9 \u2014 Quality Control, Progress Reporting, and Variations<\/h2>\n<p>Quality control is a continuing project function. The team should check work against approved drawings, specifications, material selections, and agreed workmanship requirements at logical inspection points. Progress reporting should show what has been completed, what is next, what decisions are outstanding, and what risks may affect the programme.<\/p>\n<p>Changes after construction begins are possible, but they need control. A variation can affect more than the item being changed. Moving a wall may affect ceilings, MEP routing, joinery, finishes, approvals, and work already completed. The correct question is therefore not only \u201ccan this change be made?\u201d but also \u201cwhat else does it change?\u201d<\/p>\n<figure id=\"attachment_139\" aria-describedby=\"caption-attachment-139\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Variation-Control-Flow.avif\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-139\" src=\"https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Variation-Control-Flow.avif\" alt=\"The Full Property Renovation Process in Dubai\" width=\"1200\" height=\"522\" srcset=\"https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Variation-Control-Flow.avif 1200w, https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Variation-Control-Flow-300x131.avif 300w, https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Variation-Control-Flow-1024x445.avif 1024w, https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Variation-Control-Flow-768x334.avif 768w, https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Variation-Control-Flow-542x236.avif 542w, https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Variation-Control-Flow-1084x472.avif 1084w, https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Variation-Control-Flow-792x345.avif 792w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><figcaption id=\"caption-attachment-139\" class=\"wp-caption-text\">The Full Property Renovation Process in Dubai<\/figcaption><\/figure>\n<blockquote><p>A practical variation-control sequence is:<br \/>\n<strong>Change request \u2192 feasibility review \u2192 cost impact \u2192 programme impact \u2192 written approval \u2192 implementation<\/strong><\/p><\/blockquote>\n<p>No change that affects scope, price, or programme should rely only on a verbal site conversation. Written approval gives both the owner and project team a common record of what changed and the basis on which work continued.<\/p>\n<h2>Stage 10 \u2014 Snagging, Testing, and Handover<\/h2>\n<p>Handover is the point at which the completed property is checked, outstanding items are recorded, and relevant project information is transferred to the owner. It should not be reduced to a single visual walkthrough.<\/p>\n<p>Snagging identifies incomplete, damaged, misaligned, or defective items that need rectification. Testing should cover the systems and installations relevant to the project scope, and the owner walkthrough should explain key controls, access points, products, and maintenance information where applicable.<\/p>\n<p>A practical renovation handover pack may include:<\/p>\n<ul>\n<li><strong>Snag record:<\/strong> agreed outstanding items and rectification status.<\/li>\n<li><strong>Test results:<\/strong> records relevant to systems included in the project.<\/li>\n<li><strong>Warranties:<\/strong> product, equipment, or workmanship documents where applicable.<\/li>\n<li><strong>Manuals:<\/strong> operating and maintenance information for installed equipment.<\/li>\n<li><strong>Material references:<\/strong> useful finish, paint, tile, stone, hardware, or product details retained for future maintenance.<\/li>\n<li><strong>Access information:<\/strong> keys, remotes, codes, or system access details that are part of the completed scope.<\/li>\n<li><strong>Relevant completion documents:<\/strong> completion, approval, or close-out records required for the specific property and works.<\/li>\n<\/ul>\n<p>The exact handover documents vary with the project. The project team should agree the expected close-out package in advance rather than creating it only after the site is finished.<\/p>\n<p>Before moving into the owner-approval summary, it helps to separate responsibilities across the process:<\/p>\n<table>\n<thead>\n<tr>\n<th>Project Phase<\/th>\n<th>Client Responsibility<\/th>\n<th>Project Team Responsibility<\/th>\n<th>Third-Party Dependency<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Brief and concept<\/td>\n<td>Define priorities, approve direction<\/td>\n<td>Test needs, develop concepts, identify constraints<\/td>\n<td>Property information supplied by others where relevant<\/td>\n<\/tr>\n<tr>\n<td>Technical design<\/td>\n<td>Make timely selections and approvals<\/td>\n<td>Coordinate drawings, specifications, scope and interfaces<\/td>\n<td>Specialist input or existing-system information where required<\/td>\n<\/tr>\n<tr>\n<td>Approvals<\/td>\n<td>Provide required owner documents and authorization<\/td>\n<td>Prepare and coordinate relevant submission information<\/td>\n<td>Building, community, developer, or authority review depending on scope<\/td>\n<\/tr>\n<tr>\n<td>Procurement<\/td>\n<td>Approve specified selections and commercial decisions<\/td>\n<td>Plan orders, track lead times, coordinate substitutions if needed<\/td>\n<td>Supplier availability and logistics<\/td>\n<\/tr>\n<tr>\n<td>Construction<\/td>\n<td>Respond to documented decision requests<\/td>\n<td>Manage sequencing, quality, progress and site coordination<\/td>\n<td>Inspections or third-party access where applicable<\/td>\n<\/tr>\n<tr>\n<td>Variations<\/td>\n<td>Approve or reject documented changes<\/td>\n<td>Assess feasibility, cost and programme impact before implementation<\/td>\n<td>Supplier, consultant, or authority input if affected<\/td>\n<\/tr>\n<tr>\n<td>Handover<\/td>\n<td>Attend walkthrough and confirm outstanding items<\/td>\n<td>Test, rectify, compile relevant handover information<\/td>\n<td>Warranty or certification documents from applicable suppliers or specialists<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>What the Owner Must Approve at Each Stage?<\/h2>\n<p>Owner approvals are decision gates that prevent the project from advancing on assumptions. Approve project priorities and scope at brief stage, then the layout and design direction at concept stage. During technical design, approve materials, fixtures, joinery intent, and the coordinated package needed for pricing and execution.<\/p>\n<p>Before procurement, confirm selections that affect orders and lead times. During construction, respond to documented decisions that materially affect the approved outcome. For variations, approve the change only after feasibility and any effect on price or programme are understood. At handover, review the property, confirm the snag record, and receive the agreed completion information. Routine technical coordination should remain with the project-management team rather than being pushed back to the owner.<\/p>\n<h2>How INFRANOVA Manages the Process?<\/h2>\n<p>INFRANOVA presents its renovation delivery as an integrated process connecting design, procurement, execution, and handover. Its public renovation page describes coordinated in-house execution from demolition through construction and installation, while the project portfolio provides residential and commercial examples of that model.<\/p>\n<figure id=\"attachment_138\" aria-describedby=\"caption-attachment-138\" style=\"width: 850px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Full-Property-Renovation-Process-in-Dubai.avif\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-138\" src=\"https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Full-Property-Renovation-Process-in-Dubai.avif\" alt=\"Villa and Apartment Renovation Evidence\" width=\"850\" height=\"425\" srcset=\"https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Full-Property-Renovation-Process-in-Dubai.avif 850w, https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Full-Property-Renovation-Process-in-Dubai-300x150.avif 300w, https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Full-Property-Renovation-Process-in-Dubai-768x384.avif 768w, https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Full-Property-Renovation-Process-in-Dubai-542x271.avif 542w, https:\/\/infranovagroup.ae\/blog\/wp-content\/uploads\/2026\/10\/Full-Property-Renovation-Process-in-Dubai-792x396.avif 792w\" sizes=\"auto, (max-width: 850px) 100vw, 850px\" \/><\/a><figcaption id=\"caption-attachment-138\" class=\"wp-caption-text\">Villa and Apartment Renovation Evidence<\/figcaption><\/figure>\n<p>Two published projects show how the same process logic can apply to different property types:<\/p>\n<table>\n<thead>\n<tr>\n<th>Property Type<\/th>\n<th>Initial Brief<\/th>\n<th>Key Constraint<\/th>\n<th>Process Decision<\/th>\n<th>Completed Outcome<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><a href=\"https:\/\/infranovagroup.ae\/projects\/dubai-hills-villa\" target=\"_blank\" rel=\"noopener\">Dubai Hills Villa<\/a>, residential<\/td>\n<td>Complete renovation of a family villa in Dubai Hills<\/td>\n<td>Coordinate interior and exterior works across multiple disciplines<\/td>\n<td>INFRANOVA reports managing the renovation from demolition through final delivery as one design-and-build process<\/td>\n<td>A completed family villa with coordinated interior works, landscaping, finishes, and other services listed on the project page<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/infranovagroup.ae\/projects\/crypto-office\" target=\"_blank\" rel=\"noopener\">Crypto Office<\/a>, commercial<\/td>\n<td>Design and renovate a 200 sqm office in JLT<\/td>\n<td>Create a distinctive branded workspace while keeping it functional for business use<\/td>\n<td>The project combined design, demolition, fit-out, FF&amp;E integration, bespoke carpentry, and glass elements<\/td>\n<td>A completed office with an integrated layout, finishes, custom elements, and client-facing workspaces<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>These examples should be read as project-specific evidence, not as a promise that every renovation includes the same scope. For more examples across villas, apartments, offices, and commercial spaces, see INFRANOVA\u2019s <a href=\"https:\/\/infranovagroup.ae\/projects\">completed renovation projects<\/a>.<\/p>\n<div class=\"infranova-cta infranova-cta--final\" style=\"box-sizing: border-box; max-width: 100%; background-color: #002060; border: 2px solid #002060; padding: 24px; margin: 32px 0; border-radius: 10px; color: #fafafa; font-family: 'Raleway',Arial,sans-serif;\">\n<h3 style=\"margin: 0 0 12px 0; color: #fafafa; font-family: 'Playfair Display',Georgia,serif; font-size: 24px; line-height: 1.35;\">Discuss Your Property Renovation with INFRANOVA<\/h3>\n<p style=\"margin: 0 0 20px 0; color: #fafafa; font-family: 'Raleway',Arial,sans-serif; line-height: 1.65;\">If you are moving from an initial idea toward a defined renovation scope, discuss the property, priorities, and current constraints with the INFRANOVA team before execution begins.<\/p>\n<p style=\"margin: 0 0 12px 0;\"><a style=\"display: inline-block; background-color: #e6ded3; color: #002060; text-decoration: none; padding: 11px 18px; border-radius: 6px; font-family: &#039;Raleway&#039;,Arial,sans-serif; font-weight: bold;\" href=\"https:\/\/infranovagroup.ae\/contact#form-section\">Discuss Your Renovation<\/a><\/p>\n<p style=\"margin: 0;\"><a style=\"color: #fafafa; text-decoration: underline; font-family: &#039;Raleway&#039;,Arial,sans-serif; font-weight: 600;\" href=\"https:\/\/infranovagroup.ae\/calculator\">Use the Renovation Cost Calculator<\/a><\/p>\n<\/div>\n<h2 id=\"frequently-asked-questions\" class=\"sd-faq-heading\">Frequently Asked Questions<\/h2>\n","protected":false},"excerpt":{"rendered":"A full property renovation in Dubai is not simply a sequence of construction tasks. It is a coordinated&hellip;","protected":false},"author":2,"featured_media":135,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"csco_display_header_overlay":false,"csco_singular_sidebar":"","csco_page_header_type":"","csco_page_load_nextpost":"","csco_page_reading_time":"","csco_page_toc_navigation":"","csco_post_video_location":[],"csco_post_video_location_hash":"","csco_post_video_url":"","csco_post_video_bg_start_time":0,"csco_post_video_bg_end_time":0,"csco_post_video_bg_volume":false,"footnotes":""},"categories":[16],"tags":[],"class_list":["post-103","post","type-post","status-publish","format-standard","has-post-thumbnail","category-renovation","cs-entry","cs-video-wrap"],"_links":{"self":[{"href":"https:\/\/infranovagroup.ae\/blog\/wp-json\/wp\/v2\/posts\/103","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infranovagroup.ae\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infranovagroup.ae\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infranovagroup.ae\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infranovagroup.ae\/blog\/wp-json\/wp\/v2\/comments?post=103"}],"version-history":[{"count":6,"href":"https:\/\/infranovagroup.ae\/blog\/wp-json\/wp\/v2\/posts\/103\/revisions"}],"predecessor-version":[{"id":137,"href":"https:\/\/infranovagroup.ae\/blog\/wp-json\/wp\/v2\/posts\/103\/revisions\/137"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infranovagroup.ae\/blog\/wp-json\/wp\/v2\/media\/135"}],"wp:attachment":[{"href":"https:\/\/infranovagroup.ae\/blog\/wp-json\/wp\/v2\/media?parent=103"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infranovagroup.ae\/blog\/wp-json\/wp\/v2\/categories?post=103"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infranovagroup.ae\/blog\/wp-json\/wp\/v2\/tags?post=103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}